Image Source: The Urbanists
Oggy Bloggy Ogwr doesn’t receive any subsidy and isn’t funded by the BBC. If you like what I’m doing here and think this work is important in keeping locals informed of what’s happening in Bridgend, consider a donation. One-off or monthly; as little or as much as you want. Click the links below, or full details are available here.
A public consultation has opened on Cwm Taf Morgannwg Health Board’s proposed Health Centre in Maesteg.
The controversial proposal – which will see services move from Maesteg Community Hospital – was approved in principle by the health board in May this year.
The health board has faced strong criticism over how they’ve approached the consultation process, while there is an organised campaign calling for services to be kept at a redeveloped Maesteg Hospital. The permanent loss of community hospital beds has also been a key feature of that campaign.
During October and November, the health board have undertaken in-person meetings and events to outline their plans.
The consultation is a pre-application consultation. This means it’s supposed to iron out any issues before a full planning application is submitted to Bridgend Council.
The proposed Health Centre is a larger version of the recently completed Health Centre at Sunnyside in Bridgend and is also similar to the medical centre in Porthcawl. It would be built on land opposite Ewenny Road railway station and next to a proposed bus interchange (being developed by the Cardiff Capital Region).
The initial plans include an urgent care centre/minor injuries unit (including radiology/x-ray department) and podiatry services on the ground floor, a GP surgery/surgeries and clinic rooms on the first floor, and mental health, community and staff facilities on the second floor.
95 parking spaces are proposed, 10 of which would be electric vehicle charging bays. There would also be a drop off zone close to the entrance and over 60 spaces for bikes (formal and informal).
As the proposed centre is right next to the River Llynfi a flood impact assessment is included as part of the consultation. A flood channel is supposed to redirect flood water away from the area, though a flood emergency plan is included.
Based on the 28-day period for pre-application consultations, the consultation is set to close on or by 17th December 2026. All of the details are available here.










